Bridgethorn – Neff
Bridgethorn – Neff Service Change – Ryan, Zach
Bridgethorn - Neff 13233 Debbie Ln., Clermont, FL.Contract Materials in shop Inspection scheduled Need wire measurement for addition panel. SECO disconnecting at 9:00am 7:00am job site
Bridgethorn – Neff Temp – Ben
Bridgethorn - Neff 13233 Debbie Ln., Clermont, FL.SEE NOTE BELOW*** Time and Materials Breaker in shop Install quad breaker and connect power to GFI at service for construction. 8-9:00am ***this is a construction site where we’re actively doing a remodel and this breaker can be installed at any time on the way back from J concepts we could knock this out enroute…
Bridgethorn – Neff Trim – Dustin
Bridgethorn - Neff 13233 Debbie Ln., Clermont, FL.Contract 7:00am
Bridgethorn – Neff – Dustin, Paul
Bridgethorn - Neff 13233 Debbie Ln., Clermont, FL.Contract EMT on front apron, may be other materials in shop on pallet or outgoing job shelf 7:00am
Bridgethorn – Neff Rough – Dustin
Bridgethorn - Neff 13233 Debbie Ln., Clermont, FL.Contract (After Aronoff)
Bridgethorn – Neff Rough – Dustin
Bridgethorn - Neff 13233 Debbie Ln., Clermont, FL.Contract Materials in shop Make sure you get book and print from office 11:00am
Bridgethorn – Neff – Ryan
Bridgethorn - Neff 13233 Debbie Ln., Clermont, FL.Contract Heat conduit up and roll into wall Frame wall will be flush with block on stairwell side. (After you get the guys going at 156) talk with me and Ben about this. He may have time to catch this after he gets done at Rosemary Gay’s
Bridgethorn – Neff Demo Investigate – Ben
Bridgethorn - Neff 13233 Debbie Ln., Clermont, FL.Time and Materials Book and Print in shop Investigate contractor completed demo secure any wiring we want to keep. Mark and draw in. (After Weber) 2 hours budgeted in contract