Derelle – Freedman
Derelle – Freedman Trim – Vilmos
Derelle - Freedman 1229 Dorchester St., Orlando, Fl., FL, United StatesTime and Materials Smoke detector (need to pick one up) Uncover receptacle??? 3:00pm
Derelle – Freedman Trim – Vilmos
Derelle - Freedman 1229 Dorchester St., Orlando, Fl., FL, United StatesCALL FIRST AND CONFIRM WITH STEVE Time and Materials Wire Tracer Find buried receptacle 7:00am
Derelle – Freedman Trim – Vilmos
Derelle - Freedman 1229 Dorchester St., Orlando, Fl., FL, United StatesContract Per Scott; Rick, I need him to take some carflex with him tomorrow. Need to move a/c disconnect a few inches so they can reinstall the post for the fence that we took down 7:00am steve will be there after 8:00am to help with medicine cabinets
Derelle – Freedman Trim – Vilmos
Derelle - Freedman 1229 Dorchester St., Orlando, Fl., FL, United StatesContract Materials on site 7:00am
Derelle – Freedman Trim – Dustin
Derelle - Freedman 1229 Dorchester St., Orlando, Fl., FL, United StatesContract Materials being delivered to jobsite Trim (After Blum) T&M Correct issues from inspection at existing home. - wires in panel not connect to anything $145/hr Call to confirm date Dave Freedman 407-463-3660
Derelle – Freedman Rough – Vilmos
Derelle - Freedman 1229 Dorchester St., Orlando, Fl., FL, United StatesContract Inspection issues (after inspection at Charter Research)
Derelle – Freedman – Vilmos
Derelle - Freedman 1229 Dorchester St., Orlando, Fl., FL, United StatesContract Finish Rough 9:00am
Derelle – Freedman Rough – Vilmos
Derelle - Freedman 1229 Dorchester St., Orlando, Fl., FL, United StatesContract 7:00am (job site)
Derelle – Friedman – Vilmos
Derelle - Freedman 1229 Dorchester St., Orlando, Fl., FL, United States"Formerly known as Freedman" I was spelling it wrong Contract Need - 1/2" paddle bit We have written approval to drill a 1/2" hole in support column per Steve with Derelle. Finish Rough (after Roche)
Derelle – Freedman Rough – Vilmos
Derelle - Freedman 1229 Dorchester St., Orlando, Fl., FL, United StatesContract Framing done, finish rough, they want to get the home runs ran up to where they gonna tie in at to the existing house. Leave long enough to reach the panel and roll up and secure where can reach them from the existing attic. Run to panel later. 7:00am