Edge Elevator – Dustin, Paul

Edge Elevator 653 Gadson St., Groveland, Fl., FL, United States

Contract Materials in shop Welder receps Compressor circuit 7:00am

Edge Elevator – Dustin

Edge Elevator 653 Gadson St., Groveland, Fl., FL, United States

Time and Materials Panel tune ups 400 side Connections check at office and welder west wall under office 7:00am

Edge Elevator – Dustin, Christian

Edge Elevator 653 Gadson St., Groveland, Fl., FL, United States

Contract Materials in shop??? Boom Lift (make sure tag on the back) Fall Arrest Harness Relamp wall packs Relocate 2 rear wall packs to new exterior of building. One or Two wall packs has paint on them gonna need some kind of acetone or denatured alcohol to clean it 7:00am

Edge Elevator – Dustin, Paul

Edge Elevator 653 Gadson St., Groveland, Fl., FL, United States

Contract Materials at shop Lift on site Must be done with all High work before Friday 7:00am

Edge Elevator – Dustin, Paul

Edge Elevator 653 Gadson St., Groveland, Fl., FL, United States

Contract Balance panels See notes from Josh 7:00am

Edge Elevator – Dustin, Paul, Vilmos

Edge Elevator 653 Gadson St., Groveland, Fl., FL, United States

Contract Vilmos stop by and show Dustin the plan Dustin materials are in shop 7:00am