Hauff – Van Sprang
Hauff – Van Sprang Service – Ben
Hauff - Van Sprang 17506 Deer Island Rd., Deer Island, Fl.Contract Pull materials from shop 2” Add SECO down pipe 10:00am
Hauff – Van Sprang Service – Ryan
Hauff - Van Sprang 17506 Deer Island Rd., Deer Island, Fl.Contract transfer switch is on the job so we can finish the service Nail plate panel wall 7:00am
Hauff – Van Sprang Rough – Ryan
Hauff - Van Sprang 17506 Deer Island Rd., Deer Island, Fl.Contract Bond one gas line, if multiple must be change ordered. Build Service materials on site meter and ext panels (After Bitter)
Hauff – Van Sprang Rough – Ben
Hauff - Van Sprang 17506 Deer Island Rd., Deer Island, Fl.Contract boxes on site wire in shop Make sure you have book and print 7:00am Jim Baker super for Hauff
Hauff – Van Sprang Lintel – Dustin, Paul
Hauff - Van Sprang 17506 Deer Island Rd., Deer Island, Fl.Contract Materials, book and print in shop (After Volheim)
Hauff – Van Sprang. T Pole – Logan
Hauff - Van Sprang 17506 Deer Island Rd., Deer Island, Fl.Contract make T Pole Corrections 4:00pm
Hauff – Van Sprang Slab – Logan, Justin L.
Hauff - Van Sprang 17506 Deer Island Rd., Deer Island, Fl.Contract You can get in as early as 6:00am
Hauff – Van Sprang Slab – Logan, Justin L.
Hauff - Van Sprang 17506 Deer Island Rd., Deer Island, Fl.Contract UG (Materials being delivered to site) Set UG T Pole (get one from shop, make sure it is inspection worthy) Post hole diggers in the back of truck 668 Print on outgoing job shelf MAKE SURE TO GRAB STAKES Jeremy will be getting floor box dimensions first thing in the morning (After Merwine)