Jaime Bravo Generator – Ryan, Zach

Jaime Bravo 16242 Voltera Pt., Montverde, FL.

Contract Install subpanel relocate loads from meter main combo Time and materials Investigate feasibility of separating alarm and pump??? (After KNIGHT)

Bravo – Generator – Ryan, Zach

Jaime Bravo 16242 Voltera Pt., Montverde, FL.

Contract Finish feeder pipe and tie in for inspection Have office schedule inspection when completed (After You get Tanner set at 315)

Bravo – Generator – Ryan

Jaime Bravo 16242 Voltera Pt., Montverde, FL.

Contract Irrigation materials in shop to reroute drip tubing. Transfer switches in job trailer Generator materials at Lot 315 (After Lot 131)