Masterline – Dustin, Paul, Justin, Ruben, Ben, Gerard

Masterline 700 Bay St. 700 W. Bay St., Winter Garden, Fl., FL, United States

Time and Materials Secondary panel for transformer coming from Besco to the job site Justin will be there after service call Ruben will report straight to job 7:00am

Masterline – Dustin, Paul

Masterline 700 Bay St. 700 W. Bay St., Winter Garden, Fl., FL, United States

Time and Materials Move lights Add circuits 7:00am

Masterline – Ben

Masterline 700 Bay St. 700 W. Bay St., Winter Garden, Fl., FL, United States

Two front lights A few power boxes to finish Anything not sure about call Brandon. (after Coleman)

Masterline Adventure Van – Dustin

Masterline 700 Bay St. 700 W. Bay St., Winter Garden, Fl., FL, United States

Meet Russell Gay and go over lay out and figure materials needed to wire. 5:00pm

Masterline – Brandon

Masterline 700 Bay St. 700 W. Bay St., Winter Garden, Fl., FL, United States

Time and Materials Remove A/C disconnect and extend WP GFI out for facade (after Performing Arts)

Masterline – Brandon, Josh M.

Masterline 700 Bay St. 700 W. Bay St., Winter Garden, Fl., FL, United States

Time and Materials (after shop meeting)

Masterline – Brandon, Matt, Tanner

Masterline 700 Bay St. 700 W. Bay St., Winter Garden, Fl., FL, United States

Time and Materials 7:00am Assuming we are as far as we can go at IHP

Masterline – Brandon

Masterline 700 Bay St. 700 W. Bay St., Winter Garden, Fl., FL, United States

Time and Materials 7:00am

Masterline – Brandon

Masterline 700 Bay St. 700 W. Bay St., Winter Garden, Fl., FL, United States

Time and Materials (after Yorkshire)

Masterline – Brandon

Masterline 700 Bay St. 700 W. Bay St., Winter Garden, Fl., FL, United States

If it works out where you can work here any part of the day. 7:00am