Mainstreet Community Bank – Ben

Mainstreet Bank 1515 SR-50 E, Clermont, Fl., FL, United States

Replace ballast in upstairs can Material in shop (After Worrall)

Mainstreet Community Bank – Dustin, Paul

Mainstreet Bank 1515 SR-50 E, Clermont, Fl., FL, United States

Time and Materials Boom lift Two front light poles retrofit to LED MATERIALS IN SHOP 7:00am they get there at 7:45am and open so you can hot check your work.

Mainstreet Community Bank – Ben

Mainstreet Bank 1515 SR-50 E, Clermont, Fl., FL, United States

Replace ballast for bathroom light. Materials in shop $125 per/hr + materials 9-11:00am

Main Street Bank – Ben

Mainstreet Bank 1515 SR-50 E, Clermont, Fl., FL, United States

Contract Materials in shop 9-11:00am

Mainstreet Community Bank – Brandon

Mainstreet Bank 1515 SR-50 E, Clermont, Fl., FL, United States

Recessed lighting out in upstairs and downstairs of building, Susan said 5-6 total. $125 per/hr + materials $95 per/hr for each additional hour 352.404.0404 8:00am (after Abel's Academy)

Mainstreet Community Bank – Brandon

Mainstreet Bank 1515 SR-50 E, Clermont, Fl., FL, United States

Time and Materials replace 2 ballasts in shop $95 per/hr + materials 8:00am

Mainstreet Community Bank of Florida – Matt

Mainstreet Bank 1515 SR-50 E, Clermont, Fl., FL, United States

Contract Materials in shop Teller drive thru overhang lighting priority. When you get close to having all of the overhand done, call Josh and have him bring the boom lift for the pole lights. 7:00am