• Matt Earnest – Justin G.

    Matt Earnest 620 Cherry Laurel St, Minneola, FL, United States

    Ceiling fan install 125.00/hr + material 7-8a

  • Matt Earnest – Ben

    Matt Earnest 620 Cherry Laurel St, Minneola, FL, United States

    Materials in shop (flood fixture) Exchange backyard flood light for non motion flood light Install switch in bedroom for backyard flood light. Install motion sensor flood in front $95 per/hr + materials 352.536.2360 7:00am

  • Matt Earnest – Billy

    Matt Earnest 620 Cherry Laurel St, Minneola, FL, United States

    Warranty Materials in shop Replace lamps, make sure they dim properly. Change dimmer if necessary 7:00am

  • Matt Earnest – Ben, Nick

    Matt Earnest 620 Cherry Laurel St, Minneola, FL, United States

    Contract Materials in shop, proposal with materials 7:00am

  • Matt Earnest – Ben

    Matt Earnest 620 Cherry Laurel St, Minneola, FL, United States

    Time and Materials Install 2 new LED recessed cans with dimmer switch in office Attic access available