McGill Dock – Billy, Tanner

McGill 3640 Lane Park Rd., Tavares, Fl., FL, United States

Time and Materials Materials in shop, 2 1/2" PVC conduit is for the feeder conduit for the meter at the house. Billy, please make arrangements to pick up Tanner on your way to the shop to get the materials 7:00am job site

McGill Dock – Billy, Chris H., Dustin, Paul

McGill 3640 Lane Park Rd., Tavares, Fl., FL, United States

Contract Dustin and Paul have to go to Robinson first (after moving disposal switch and sm appl receptacle to the right of the sink, currently behind sink "no bueno")  

McGill Dock Service – Ben

McGill 3640 Lane Park Rd., Tavares, Fl., FL, United States

Time and Materials Materials in shop I will bring the concrete post out on a trailer, make sure you have post holes diggers. (after Magnolia Point)

McGill Trim – Derrek, Chris H.

McGill 3640 Lane Park Rd., Tavares, Fl., FL, United States

Contract Ryan has punch list and will get you laid out on site. Ryan as soon as you get them going, head to Palmer. Also we need to build the dock service. Need materials list for this. 7:00am

McGill Trim – Derrek

McGill 3640 Lane Park Rd., Tavares, Fl., FL, United States

Contract Materials on site Lock Box code 712 Plug and Switch 7:00am Chris H. called out sick, Derrek will be taking Nolette as far as he can go and then falling in here to finish the day.

McGill Rough – Ryan, Chris

McGill 3640 Lane Park Rd., Tavares, Fl., FL, United States

Contract Wire being delivered, I will bring a gang box from Palmer during the day. 7:00am

McGill Lintel – Dustin, Paul

McGill 3640 Lane Park Rd., Tavares, Fl., FL, United States

Contract Materials, book and print in shop (Make sure Staci writes down that you have the book) 7:30am