Michael Hutchinson – Ben, Gerard

Michael Hutchinson 10712 Summit Lakes Ln., Clermont, Fl., FL, United States

Time and Materials 5 hi-hats installed in kitchen 15-20 ft. ***Possibly need 16 ft ladder*** $145 per/hr + materials (confirm rate with office) $65 per/hr for helper 856-912-1843

Michael Hutchinson – Vilmos

Michael Hutchinson 10712 Summit Lakes Ln., Clermont, Fl., FL, United States

Replace GFI that isn't working $125 per/hr + materials 215.357.4169 1-3:00pm

Micheal Hutchinson – Ben

Michael Hutchinson 10712 Summit Lakes Ln., Clermont, Fl., FL, United States

Install foyer light, prewired approximately 17' Should be able to reach on a 12' $180 ladder adder Check dining switch, turns lights on but will not turn them back off $125 per/hr + materials 215.357.4169 7-8:00am