Robinson Trim – Nick, Chris H.

Robinson 11301 Lake Montgomery Blvd., Clermont, Fl., FL, United States

Contract Trim Weatherproof exterior, safety off above 8' with wire nuts, box and blank below 8' Get with Josh C. if you need any materials Meter final scheduled for Friday morning. 7:00am

Robinson Trim – Nick

Robinson 11301 Lake Montgomery Blvd., Clermont, Fl., FL, United States

Contract Materials in shop (after Ross)

Robinson – Nick

Robinson 11301 Lake Montgomery Blvd., Clermont, Fl., FL, United States

Contract Finish low volt, cut in, print walk, make trim list. Paint out openings When you finish go to Green Gate 7a

Robinson Rough – Billy, Derrek

Robinson 11301 Lake Montgomery Blvd., Clermont, Fl., FL, United States

Contract make sure well is connected and ready for power. Use conduit feeding to the garage, install junction box with conduit feeding well. (after Aviles)

Robinson Rough – Nick, Josh C.

Robinson 11301 Lake Montgomery Blvd., Clermont, Fl., FL, United States

Contract 7:00am Walk Through scheduled for 10:00am Josh Chase will come out to assist with walk thru and take notes. Jared should be in attendance from Weber Construction.

Robinson Rough – Nick

Robinson 11301 Lake Montgomery Blvd., Clermont, Fl., FL, United States

Contract materials on job site, your taking the Ranger, make sure you have screws, nails, staples, foam, tie wraps make sure you have the book and print (after shop)

Robinson Move Service – Ryan, Chris

Robinson 11301 Lake Montgomery Blvd., Clermont, Fl., FL, United States

Contract See photo in text, move from existing location to new one drawn, conduit underground will be abandoned, a overhead 250mcm SER will be ran. Dig up and relocate UFER ground wire to new service location. 7:00am

Robinson Slab – Ben, Josh C.

Robinson 11301 Lake Montgomery Blvd., Clermont, Fl., FL, United States

Contract Materials will be delivered to site at 12:00pm 12:00pm