SLCL – 906 Jan Mar – Gerard, Nick

SLCL 906 Jan Mar 906 Jan Mar Ct., Minneola, Fl., FL, United States

Time and Materials Nick has notes and has walked through with me. Start with Demo Materials being delivered to site Zaheer 3623484718 unlock doors 7:00am

SLCL 906 Jan Mar Ct. – Ben

SLCL 906 Jan Mar 906 Jan Mar Ct., Minneola, Fl., FL, United States

Unit E Key to unit in office. A/C breaker burnt up. Bus bar damaged. A/C contractor put in 20a temporary breaker in a different slot. Assess and make repairs. 7:00am

Glenn Winn – Dustin (didn’t go to)

SLCL 906 Jan Mar 906 Jan Mar Ct., Minneola, Fl., FL, United States

Sump pump recept has gone out at Margaret woodcraft $145/h + material 1 hr minimum On way home 352-404-3194 3-4:00pm

South Lake Commercial Leasing 906 Jan Mar Unit E – Matt

SLCL 906 Jan Mar 906 Jan Mar Ct., Minneola, Fl., FL, United States

Time and Materials Fixtures on will call at City if they haven't all come in, pick up what they have to get started. Replace lay in fixtures in big open room, LED flat panels going in place of existing lay ins. Demo and remove exhaust fan and blank off switch in same big room Replace…